http://www.djc.com/news/co/12024681.html
Seattle Daily Journal Of Commerce

December 21, 2010

Western Building to be rehabbed or demolished for tunnel project
Tenants have been told they must vacate the building at 619 Western Ave. by March of 2012.
By KATIE ZEMTSEFF
Journal Staff Reporter
The Western Building at 619 Western Ave. will either get a thorough structural rehab or be demolished as crews prepare to bore an almost two-mile tunnel under downtown to replace the Alaskan Way Viaduct. The building’s fate will likely be decided by the end of January.

With a 57-foot diameter, the machine needed to dig the proposed tunnel would be the largest boring machine in the world.

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s